Due to the four-hour closure of the railway track, passengers continued to experience difficulties. In Dasni, rats had created a depression beneath the railroad track.
Deep screening took place on Monday due to the potential for harm. This time frame included the replacement of the track ballast in addition to the repairs. The entire operation took four hours.
About 11 trains, including the Shatabdi and Vande Bharat Express, that were traveling from Dehradun on Monday were impacted by repairs being made to the railway track at Dasni, which is close to Aithal. For around four hours, the track was closed, which caused issues for the passengers.
Rats had created a depression beneath the railroad track at Dasni, according to the source. Deep screening took place on Monday due to the potential for harm. This time frame included the replacement of the track ballast in addition to the repairs. The entire operation took four hours.
As a result, the Shatabdi Express, which was traveling from New Delhi to Dehradun, and the Vande Bharat Express, which was traveling from Dehradun to Anand Vihar, arrived at their destinations 1.40 and 2.38 hours late, respectively. In addition, several trains along the line had disruptions. The passengers had to deal with a lot of difficulties in this situation. Following repairs, the track was restarted.